Network maintenance will occur between 6:00AM and 7:00AM on 4/29/14. Temporary outages may occur in residential locations during this time.
Author: Sidharth Nandury
Resolved: Uplanned Residential Wireless Outage
Update:
Residential wireless was restored at 10:40AM.
Original Message:
9:30AM half of the residential wireless is currently offline. Action is being taken to identify and correct the issue. Residence halls on east, north and west quad may be effected.
Completed – Wireless Network Maintenance – 5:00AM-7:00AM – 4/22/14 – 4th Floor Samson Talbot
Update:
Maintenance was completed at 7:10AM
Original Message:
Network testing will occur between 5:00AM & 7:00AM on 4/22/14 for continued testing of wireless equipment. The process will only effect the 4th floor of Samson Talbot. Temporary wireless network outages will occur during this time frame in this location.
Completed – Network Maintenance – 5:00AM-7:00AM – 4/15/14 – 4th Floor Slayter
Network testing will occur between 5:00AM & 7:00AM on 4/15/14 for continued testing of wireless equipment. The process will only effect the 4th floor of Slayter. Temporary network outages will occur during this time frame in this location.
Completed – Network Maintenance – 5:00AM-7:00AM – 4/8/14 – 4th Floor Slayter & 4th Floor Samson-Talbot
Network testing will occur between 5:00AM & 7:00AM on 4/8/14 for continued testing of wireless equipment. The process will only effect the 4th floor of Slayter and the 4th floor of Samson-Talbot. Temporary network outages will occur during this time frame in these locations.
Completed – Planned Network Outage – 5:00AM to 7:00AM – 4/1/14 – Burton Morgan, Samson Talbot, 4th Floor Slayter
Network testing will be performed in Samson Talbot, Burton Morgan and Slayter on 4/1/14 between the hours of 5:00AM and 7:00AM. This testing will result in temporary service disruptions as we will be simulating power outages for data collection purposes.
Completed – Network Maintenance – Herrick – 2/20/14
Herrick Performance Hall is reserved on 2/20/14 from 10:00AM to 4:30PM for ITS network maintenance. This is a continuation of work to install new cabling and wireless equipment.
Completed – Network Maintenance – 2/20/14
On 2/20/14, during the ITS maintenance window of 5:00AM to 7:00AM, work will be completed on the wireless network in administrative and academic areas. There will also be work completed on the wired network in Talbot and the Mitchell Center. Temporary outages may occur from 5:00AM to 7:00AM.
Completed – Network Outage – Herrick Performance Hall – 2/12/14
The planned maintenance for 2/12/14 was completed. Continued maintenance is expected in Herrick to complete the project.
Planned:
Installation of new networking equipment will begin in Herrick Performance Hall on 2/12/14 at 1:30PM. This will include installation of a networking box, a network switch and cable runs for new wireless access points. The work will be preformed after regularly scheduled classes and the building has been reserved for ITS maintenance from 1:30PM to 5:00PM.
Update/Delayed:
Due to priority tasks this work will be delayed until Wendesday, 2/12/14.
Original Post:
Installation of new networking equipment will begin in Herrick Performance Hall on 2/7/14 at 8:00am. This will include installation of a networking box, a network switch and cable runs for new wireless access points. While work will begin at 8:00AM it will not interrupt the regularly scheduled classes. Work will continue throughout the day until completed.
Completed – Network Outage – Burton Morgan – 2/11/14 – 5:00AM to 7:00AM
On Tuesday, 2/11/24, network maintenance will be preformed in Burton Morgan between the hours of 5:00AM and 7:00AM. Removal of old network equipment will occur which may cause a temporary network outage in Burton Morgan.