Author: Terri Beamer
Completed – Planned Network Maintenance – 8/1/13
ITS will be performing scheduled network maintenance on 8/1/2013 during the maintenance window of 5:00a.m. to 7:00a.m. These configuration updates are expected to produce a 10-15 minute outages for some buildings in the North quad .
Planned Network Maintenance – 7/18/2013
ITS will be performing scheduled network maintenance on 7/18/2013 during the maintenance window of 5:00a.m. to 7:00a.m. These configuration updates are expected to produce multiple short outages for Burton Morgan during the maintenance period.
Banner access down
On Friday, February 22nd, between 4pm and 4:30 there was network instability that caused customers to get disconnected from Banner. The problem has been corrected and network was stable again by 4:30.
MyDenison and non-faculty/staff/student accounts
Please note that the new MyDenison site does not allow access to those accounts that are not Denison Faculty, Denison Staff and Denison Students. Accounts for contractor staff (e.g. Sodexo) and others that do not fall in the 3 main categories, must access their Denison Apps email and calendar directly at via the link email.denison.edu (or apps.denison.edu).
Updated: Internet access outage 1/24/2013 6:00pm
Update 1/24/2013 6:25pm: Work has completed. Please report any issues to the ITS Help Desk at 740-587-6395 or helpdesk@denison.edu.
A bandwidth shaper configuration change will be put in place this evening at 6pm. This may cause an internet outage of up to 15 minutes.
Network Maintenance 12/20/2012
Updated configurations on most admin and academic building up-links between 6am – 7:30am this morning. Will finish the remaining academic and admin buildings after 4:30pm today (Bryant, Physical Plant, Sigma Chi, and Library). Will be updating configurations for dorm up-links throughout the day. We will post updates as we start and finish general areas of campus. The configuration changes may cause a momentary slowness or connection drop.
**Update** 1:21pm Starting config changes on South campus dorms.
**Update** 1:50pm Done with South campus dorms starting East campus dorms.
**Update** 2:10pm Done with East campus dorms starting with West and North campus dorms.
**Update** 3:00pm Done with West and North campus dorms.
**Update** Done
*Update* Maintenance on VPN service 12/13/2012 at 6am
*Update* The upgrade is finished.
We will be upgrading our VPN service this Thursday beginning at 6am. There will be several interruptions to the service while the upgrade is taking place. We will post an update to Netnotes when the upgrade has completed.
Wireless Maintenance, Academic Quad 11/16 6-7am
We will be adjusting configurations on wireless on the academic quad between 6 and 7am this morning. The change may cause a momentary wireless outage on that quad sometime during that period.
Wireless down in some areas
Update 11/9/2012: We continue to work on the problem with support.
We have several areas on campus where wireless is not working properly. We are working with support to get the problem fixed. Updates will be posted here.