Completed: Planned Network Maintenance – 6/4/2014 5-7am – North quad and Physical Plant

Update: 6/4/2014 7am – Network maintenance completed.  All should be operating normally.

Original Message:

Wednesday, June 4th,between 5 and 7am, we will be modifying network settings on switches in 4 buildings on campus: Physical Plant, Kappa Sig, Beta, and Chamberlin.  We will also be working on the connection to the switches in Moshier Hutchinson.  These changes will cause minor network outages within these buildings and could cause some overall network disruption.